1904 Tower Plaza, Sheikh Zayed Road, opp. The Future Museum, Dubai, UAE
business@hawklandglobalfz.com
Tests blisters, bottles, vials and sachets for container closure integrity using vacuum or pressure-decay methods.
Container closure integrity testing
CE, USP container closure integrity guidance
Semi-automatic to fully automatic
1 Unit
6 – 10 weeks (build-to-order)
Pricing: configuration-dependent on capacity, automation options, and validation package. Request a quote for a specification-matched proposal.
Plant layout and equipment specification matched to your capacity target.
On-site delivery through to validation batch support.
Support through IQ/OQ/PQ documentation and first production runs.
Spare parts, operator training, and technical support for the life of the plant.
| Model No. | HWK-LTM |
|---|---|
| Capacity | Offline batch testing or inline with line speed |
| Automation Level | Semi-automatic to fully automatic |
| Application | Container closure integrity testing |
| Certification | CE, USP container closure integrity guidance |
| Power Supply | 380V / 3-phase / 50Hz (configurable to site requirements) |
| Construction | Precision instrumentation, SUS304 housing |
| Warranty | 12 months from commissioning |
| Engineering Support | Layout design, installation, commissioning, validation support |
| Lead Time | 6 – 10 weeks (build-to-order) |
| Origin | Manufactured to Hawkland engineering specification |
What capacity does the Leak Testing Machine offer?
The typical range is Offline batch testing or inline with line speed. Final output depends on your product, container or format, and operating pattern, and is confirmed by Hawkland's engineering team in your quotation.
Which standards does the Leak Testing Machine meet?
Compliance: CE, USP container closure integrity guidance. Materials: Precision instrumentation, SUS304 housing. Documentation to support your facility's qualification can be included in the project scope.
What are the lead time and warranty for the Leak Testing Machine?
Lead time is typically 6 – 10 weeks from order confirmation, as each unit is built to order. Warranty: 12 months from commissioning.
Can the Leak Testing Machine be customized to our facility and products?
Yes. It can be configured for inline integration or standalone laboratory use, and data output can be made compatible with electronic batch record systems where required.