Address

1904 Tower Plaza, Sheikh Zayed Road, opp. The Future Museum, Dubai, UAE

Send us a mail

business@hawklandglobalfz.com

Case Study · Pakistan

Neutro Pharma: Integrated IV / LVP Manufacturing Workstream

A dedicated sterile IV production workstream planned inside a wider multi-line pharmaceutical facility, bringing container formation, filling, sterilisation, utilities and controlled environments together.

100 mL PP IV Bottle Multi-Line Facility Autoclave Sterilisation Cleanroom & HVAC
LocationLahore, Pakistan
IV Container100 mL PP Bottle
FacilityMulti-Line Pharmaceutical Plant
StatusIV Workstream In Progress
01 · Project Challenge

Defining a Sterile IV Workstream Inside a Multi-Line Plant

IV manufacturing carries different process, environmental and qualification requirements from the site's other product lines. The IV scope therefore needed to be engineered as its own coordinated system.

01

A Dedicated IV Scope

The programme includes multiple dosage forms. The IV line therefore needed clear boundaries for procurement, engineering and commissioning.

02

One Coordinated Workstream

PP bottle forming and filling, autoclave sterilisation, labeling, flow packing, pharmaceutical water, dispensing, cleanroom and HVAC are organised around a common URS.

02 · Scope

Core IV Production Packages

01

PP Bottle Route

Injection moulding and blowing for the 100 mL PP IV container route.

02

IV Filling

IV filling equipment specified around the selected container and URS.

03

Autoclave Sterilisation

Sterilisation equipment with cycle and load planning defined during validation.

04

Labeling & Flow Packing

100 mL PP IV labeling and downstream flow-packing packages.

05

Water & Preparation

Water system, storage tanks, manufacturing vessels and dispensing support.

06

Cleanroom

PU-panel controlled environments with sterile areas separated from non-sterile production.

07

HVAC

DX air-handling units and supporting environmental-control infrastructure.

08

Qualification

FAT/SAT, DQ/IQ/OQ/PQ and process and cleaning validation planning.

03 · Production Route

The Proposed IV Manufacturing Chain

01Raw Materials
02PW / WFI
03Compounding
04Filtration
05Container Forming
06Filling & Closure
07Autoclave Sterilisation
08Labeling & Packing
04 · Facility Integration

Keeping the IV Scope Separate but Fully Integrated

The IV workstream is treated as a distinct sterile manufacturing package while remaining connected to the larger facility's utility, engineering and infrastructure systems.

100 mL PP Bottle

Established container basis for the reference IV workstream.

Dedicated Sterile Areas

IV cleanroom zoning separated from non-sterile production areas.

Qualification Planning

Equipment and utilities connected through a defined validation lifecycle.

Neutro Pharma is identified in the source material as a prospective Hawkland client. The facility and IV workstream remain under development, so this page does not present production results as completed outcomes.
Planning an IV / LVP Facility?

Define the Workstream Before the Equipment Is Selected

From URS development and technical planning through equipment integration, qualification and training.

Discuss Your Project →